Index003 / 004

TomsProject

Vertical Reel

Category
Vertical Reel
Type
Creative challenge
Length
00:00:32
Year
2026

Edited by Roy

A man in large headphones leans on his hand at a desk in warm evening light.
00:00:00 / 00:00:32

About the film

A 32-second vertical reel, edited for a creative challenge.

Frames

Captured from the published film

  • A man in a white T-shirt leans on a glass balcony rail above wooded hills.
    Frame 01TC 00:00:10
  • A rider on a mint green scooter heads up a street towards a tall radio tower.
    Frame 02TC 00:00:15
  • A man sits at a standing desk with monitors in a room lit in red.
    Frame 03TC 00:00:30

Have a cut in mind?

rchukroune@gmail.com

Let’s talk